List of all BSC Modifications

These pages list all Modifications issued since 2010. Modification are raised to introduce changes that would alter any part of the BSC or any CSDs or BSC Systems impacted by the proposed changes.

(Showing items 101-200 of 422)

Show 10 | 20 | 50 | 100 | All

P322

Revised Implementation Arrangements for Mandatory Half Hourly Settlement for Profile Classes 5-8
Read More

P321

Publication of Trading Unit Delivery Mode
Read More

P320

Reporting on Profile Classes 5 – 8 Metering Systems after the implementation of P272
Read More

P319: Removal of annual RMP review from PAF

Removal of annual RMP review from PAF
Read More

P318

Change of Party ID/Company Number Through Enabling Assignment
Read More

P317

Changes to the Unmetered Supplies obligations in the BSC
Read More

P316

Introduction of a single marginal cash-out price
Read More

P315: Suppliers’ Meter Volume and MPAN counts

Publication of Gross Supplier Market Share Data
Read More

P314

Reduction in PAR from 500MWh to 350MWh
Read More

P313

Required Housekeeping Changes to Implement P295 and EMR
Read More

P312

Required Housekeeping Changes to Implement P298 and EMR
Read More

P311

Required Housekeeping Changes to Implement P291 and P295
Read More

P310

Revised Credit Cover for Exporting Supplier BM Units
Read More

P309

Facility to enable BSC Parties to select either replacement contract notifications or additional contract notifications
Read More

P308

Alternative security product for securing credit under the BSC
Read More

P307

Amendments to Credit Default arrangements
Read More

P306

Expanding the definition of a ‘Letter of Credit’ to include regulated insurance companies
Read More

P305

Electricity Balancing Significant Code Review Developments
Read More

P304

Reduction in PAR from 500MWh to 250MWh
Read More

P303

Amendments to the Provisions for BSCCo Directors
Read More

P302

Improve the Change of Supplier Meter read and Settlement process for smart Meters
Read More

P301

Replacement of National Consumer Council by Citizens Advice and Citizens Advice Scotland
Read More

P300

Introduction of new Measurement Classes to support Half Hourly DCUSA Tariff Changes (DCP179)
Read More

P299

Allow National Grid access to Metering System Metered Consumption data to support the DSBR service
Read More

P298

Consequential amendments to the BSC Modification process following the implementation of Third package and other miscellaneous changes
Read More

P297

Receipt and Publication of New and Revised Dynamic Data Items
Read More

P296

Introduction of a ‘Fast Track’ Modification Process following the outcomes of the Code Governance Review (Phase 2)
Read More

P295

Submission and publication of Transparency regulation data via the BMRS
Read More

P294

Addition of Offshore Transmission System and OTSUA to the definition of the Total System
Read More

P293

Changes to BSC Section H ‘Audit’ and BSC Service Description for BSC Audit to reflect current Practice
Read More

P292

Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details
Read More

P291

REMIT Inside Information Reporting Platform for GB Electricity
Read More

P290

Enabling Elexon to participate in roles in support of the Smart Energy Code (SEC) Panel
Read More

P289

Enabling Elexon to participate in tendering for the DCC Licensee role via a subsidiary
Read More

P288

Aligning Supplier Charge SP08a calculation with current practice
Read More

P287

Allow the BSC Panel to conduct Modification Business via teleconference
Read More

P286

Revised treatment of RCRC for generation BM Units
Read More

P285

Revised treatment of RCRC for Interconnector BM Units
Read More

P284

Expansion of Elexon’s role via the ‘contract model’
Read More

P283

Reinforcing the Commissioning of Metering Equipment Processes
Read More

P282

Allow MVRNs from Production to Consumption or Vice Versa
Read More

P281

Change of BSCCo Board of Directors & Chairman
Read More

P280

Introduction of new Measurement Classes
Read More

P279

Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
Read More

P278

Treatment of Transmission Losses for Interconnector Users
Read More

P277

Allow Interconnector BM Units to choose their P/C Status
Read More

P276

Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown
Read More

P275

Extending BSC Performance Assurance
Read More

P274

Cessation of Compensatory Adjustments
Read More

P273

Make the SVA Funding Share Calculation robust to changes in Scaling Weights
Read More

P272

Mandatory Half Hourly Settlement for Profile Classes 5-8
Read More

P271

NETSO Consultation in relation to any potential changes to the BSC which takes place in forums other than the BSC Panel
Read More

P270

The Application of Line Loss Factors to GSPs that are not Transmission-interconnected
Read More

P269

Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)
Read More

P268

Clarify the P/C status process for exempt BM Units
Read More

P267

Consideration of wider industry developments and duration of proposed changes when agreeing progression timetables
Read More

P266

Improving the allocation of Reactive Power flows between Import and Export Metering Systems
Read More

P265

Improving the Accuracy of the Credit Calculation (P253 Alternative solution)
Read More

P264

Two-thirds majority requirement for Panel recommendations on licence originated Modifications
Read More

P263

Code Governance Review: Send Back Process and Environmental Assessment
Read More

P262

Code Governance Review: Significant Code Reviews, Self Governance and Code Administration Code of Practice
Read More

P261

Correcting an omission in the BSC arising from the P216 Alternative Modification legal text
Read More

P260

Extension to data provided to the Transmission Company in the TUoS Report
Read More

P259

Provision of Applicable Balancing Service Volumes for Interconnectors
Read More

P258

Including Party Agents in the Trading Disputes process
Read More

P257

Removal of the concept of Trading Queries
Read More

P256

Improving efficiency and clarity of the Trading Disputes process
Read More

P255

Profile Administrator: creating flexibility in discharging the service
Read More

P254

Removal of Main and SVA Specified Charge Amounts from the Code
Read More

P253

Improving the accuracy of the credit calculation for SVA participants
Read More

P252

Removal of Trading Parties’ ability to submit two votes at elections of BSC Panel industry members
Read More

P251

Revision of the election process for BSC Panel Industry Members
Read More

P250

Prevention of 'Timing Out' of Authority decisions on Modification Proposals
Read More

P249

Revision of banking arrangements under the BSC
Read More

P248

Aligning BSC interest calculation requirements with the FAA calculation method and P235 principles
Read More

P247

Proposer ‘ownership’ of Modification Proposals
Read More

P246

Reporting to LDSOs of Aggregated Metering Data for Embedded Networks
Read More

P245

Changes to Long Term vacant Sites Timescales
Read More

P244

Provision of BritNed flow data to the BMRS
Read More

P243

Publication of Generator Forward Availability by Fuel Type
Read More

P242

Treatment of Exemptable Generation Connected to Embedded Offshore Transmission Networks
Read More

P241

Relaxation of Requirement to Separately Meter Licensable Generating Units
Read More

P240

Switching Plant and Apparatus between BM Units
Read More

P239

Correcting Manifest Errors and Modifying an Interface in the P217 Legal Text
Read More

P238

Removal of the requirement to Meter each Boundary Point for Offshore Power Park Modules
Read More

P237

Standard BM Unit Configuration for Offshore Power Park Modules
Read More

P236

Compensation Claims for Metered Volume Reallocation Notification (MVRN) Parties arising from an Outage
Read More

P235

Aligning BSC requirements with the calculation of reconciliation interest performed by the Funds Administration Agent
Read More

P234

Housekeeping Modification - Correction and manifest errors in P217 Legal Text
Read More

P233

Housekeeping Modification - Correction of SSL References, Letters of Credit, Definitions in Section X and manifest errors in P215 Legal Text
Read More

P232

Black Start and Fuel Security Compensation and Single Imbalance Price Derivation
Read More

P231

Black Start and Fuel Security Code Procedures under the Balancing and Settlement Code (BSC)
Read More

P230

Enabling Interoperability through the use of CoP10 and CoP5 Metering
Read More

P229

Introduction of a seasonal Zonal Transmission Losses scheme
Read More

P228

Replace BMRS High Grade Service charge amounts/rates with references to a BSC website schedule
Read More

P227

Extension of the Definition of ECVAA Systems to include the centrally provided communications network
Read More

P226

Improving Large Combustion Plant Directive Information Disclosure
Read More

P225

Housekeeping Modification: Updating References to the Party Service Lines
Read More

P224

Reactive Power Flows Associated with Exemptable Generating Plant
Read More

P223

Improvements to the Profile Administrator Service
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

BSC training services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or